Free Yard & Building Volume Tool

Cubic Yard Calculator & Bulk Material Estimator

Find cubic yards, bags, weight, truck loads, and price in seconds.

Measure your space with ease. Type in your length, width, and depth to see how much soil, mulch, gravel, sand, or concrete you need to buy.

Quick Preview Live Demo
Calculated Volume
2.47
cubic yards
66.67 ft³ • 1.89 m³
Open Full Calculator with Weight & Bags →

Master Cubic Yard Calculator

Enter your project size below to get volume, store bags, weight, truck loads, and total cost.

Total Material Needed (With Buffer)
2.72
Cubic Yards
Cubic Feet 73.33 ft³ Volume in ft³
Cubic Meters 2.08 m³ Metric volume
Store Bags (2 ft³) 37 bags 2 cu ft bag count
Total Weight 0.95 US Tons Estimated load weight
Truck Loads 1 Dump Truck Delivery estimate
Estimated Cost Enter price above Total material price

Why Use Our Bulk Material Calculators

⚡ Fast Results

See your numbers update right away as you type in your sizes.

🎯 Exact Math

We use proven math rules to turn feet and inches into cubic yards.

📐 All Shapes

Works for square beds, round patios, and triangle corners.

✨ 100% Free

Use every tool for free with no sign-up or hidden fees.

How to Calculate Cubic Yards in 3 Steps

Follow these three simple steps to measure any project area.

1

Enter Your Sizes

Type in your length, width, and depth in feet or inches.

2

Pick Your Material

Choose mulch, soil, gravel, sand, or concrete from the list.

3

View Your Numbers

See your total cubic yards, bag counts, weight, and cost right away.

Common Cubic Yard Questions

Quick answers to help you order the right amount of material.

A cubic yard is a block of space that is 3 feet long, 3 feet wide, and 3 feet tall. It holds 27 cubic feet of material.
First, divide your depth in inches by 12 to get feet. Next, multiply length by width by depth in feet. Finally, divide that number by 27.
One cubic yard equals 27 cubic feet. If you buy 2 cubic foot bags, you need 13.5 bags (round up to 14 bags) to match 1 cubic yard.
Ground is rarely flat, and loose soil or mulch packs down after rain. Adding 10% extra helps make sure you do not run short at the end of your job.

Ready to Plan Your Next Project?

Enter your length, width, and depth to get your free material estimate now.

Start Calculating →